This work was carried out by the GTAER - Working Group for the Definition of Renewable Energy Acceleration Areas, created by Order no. 11912/2023 of 23 November, and is intended to consolidate and strengthen the previous work carried out to identify the areas with the least sensitivity for the location of renewable electricity production units (solar photovoltaic and wind). The work presented here assessed the potential for implementing these units in natural areas or territories.    <\/SPAN><\/SPAN><\/P>

The process of identifying RAA, took into account 5 different scenarios, depending on whether or not the following constraints were excluded: (i) areas relating to aquifers classified as porous or essentially porous, belonging to the western edge and the Tejo-Sado basin; (ii) areas relating to the distance between residential and mixed-use built-up areas and (iii) available RAN (National Agricultural Reserve) and REN (National Ecological Reserve) areas.<\/SPAN><\/SPAN><\/P>

The areas presented contribute to the definition of future preferential ARE areas - they do not constitute the formal definition of the ARE. In future AREs, the licensing process will be simplified. It should be noted that these areas are not exclusive, and renewable energy units can be implemented in the rest of the territory in accordance with the normal licensing process. The results presented reflect the situation as of February/March 2024.<\/SPAN><\/SPAN><\/P>

<\/DIV>", "summary": "", "title": "RenewableEnergyAccelerationAreas", "tags": [], "type": "Map Service", "typeKeywords": [ "ArcGIS", "ArcGIS Server", "Data", "Map Service", "Service" ], "thumbnail": "thumbnail/thumbnail.png", "url": "", "extent": [ [ -9, 37 ], [ -7, 42 ] ], "minScale": 0, "maxScale": 1, "spatialReference": "WGS_1984_Web_Mercator_Auxiliary_Sphere", "accessInformation": "", "licenseInfo": "" }